Watch as 37 panels are lifted at our Piara Waters (South) Pavilion Project back in September.
OSH Note: The power-lines appear closer than they are; all correct safety regulations were met.
Watch as 37 panels are lifted at our Piara Waters (South) Pavilion Project back in September.
OSH Note: The power-lines appear closer than they are; all correct safety regulations were met.
Alita Constructions, 2024