Projects

Piara Waters (South) Pavilion

Alita Constructions to build Piara Waters (South) Pavilion & Playing Field

Piara Waters (South) Pavilion & Playing Field

Alita constructions is pleased to announce that the City of Armadale have awarded us the Piara Waters (South) Pavilion & Playing Field project. This project includes a large hall, multi purpose room, kitchen, meeting room, club rooms, kiosk, sporting change rooms, multiple store rooms, a play area and a large sporting oval with sports lighting.

This is an exciting opportunity for Alita to partner with the City of Armadale and provide the community with a facility for sporting clubs and community groups to gather.

Architect: Fratelle Group

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Works paving the way for new Piara Waters South Pavilion

City of Armadale Mayor Henry Zelones OAM JP said the shared use arrangement between the City and the WA State Government would emulate the recently completed Harrisdale Pavilion and Playing Field.

“The partnership between the City and State Government provides an ideal solution to easing pressure on local sports fields and facilities,” he said.

“It’s a great outcome for residents as it will form part of an important education and community precinct to service the fast growing community.”

Read more here 

Construction Update:

29/01/2018

With only 7 weeks to go until practical completion, the Piara Waters (South) Pavilion Project for City of Armadale is still on track with the landscaping, carpark, oval and final internal fit-offs all scheduled for completion in the coming weeks.

Piara Waters (South) Pavilion Project for City of Armadale by Alita Constructions Piara Waters (South) Pavilion Project for City of Armadale by Alita Constructions

 

 

 

15/12/2017

Piara Waters (South) Pavilion Project for City of Armadale.

 

Look up in the sky! Its a bird! Its a plane! No…. that’s a tree.

This morning a Pyrus Chanticleer tree was transplanted into the courtyard area at our Piara Waters (South) Pavilion Project for City of Armadale.

 

 

 

19/10/2017:

The Piara Waters (South) Pavilion Project for the City of Armadale has been progressing well. In the past few weeks the structural steel has been installed and the internal fitout has begun. The bricklayers are midway installing the 45 000 bricks required to form the internal walls. At the same time the roof plumbing contractors have started the guttering and roof sheeting and the service trades have begun installing pipework and cabling in the main pavilion. Mechanical services are due to start installing early next week with the external door and window frames are scheduled for early November. It is expected that the the main pavilion will be watertight within 4 weeks.

 

Structural Steel at Piara Waters (South) Sports Pavilion by Alita Constructions Structural Steel at Piara Waters (South) Sports Pavilion by Alita Constructions Structural Steel at Piara Waters (South) Sports Pavilion by Alita Constructions

 

 

 

 

 

 

 

 

September: Panels are lifted. Watch the lift here

Piara Waters Tilt Panel Construction by Alita Constructions

 

 

29/08/2017

Watch as many truck loads of sand are brought in and spread for the carpark and building pad at the Piara Waters (South) Pavilion Project. All Civil, Electrical and Hydraulic undergrounds have now been installed. The slabs have since been poured and the concrete tilt panels are currently getting made on site.

 

 

 

Peel Youth Medical Services

Rendered Image of the Peel Youth Medical Services Health Hub

Alita Constructions has partnered with Peake Consultants and the City of Mandurah to design and construct the Peel Youth Medical Services Health Hub in Mandurah.

This building will allow for all of the services for young people located in Mandurah to be brought together in the new building to help tackle the increasing drugs, alcohol and mental health issues in the peel region.

The hub includes at least 60 consulting rooms, two training rooms and five waiting areas along with two reception areas.

Peel Youth Medical Services Health Hub news article

St. Peter’s Jacobite Syrian Church

Alita Constructions to construct St. Peter's Jacobite Syrian Church

Saint Peter’s Jacobite Church

Alita Constructions has been awarded the construction of the Saint Peter’s Jacobite Church project located in Wattle Grove.

With a total floor area of 560m2, the project consists of a tilt panel construction with steel cladding to the roof, the detailed front facade is made up of specialist brickwork, rendered with corbel detailing and timber doors and window frames.

We look forward to sharing updates with you once the project has commenced.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Construction Update:

25/01/2018

St Peter’s Church is nearing completion with the internal fit out of the building being well advanced. Alita have used Kooltherm K17 composite board as the product provides a quick and effective method to line the walls. The ceilings and bulkheads are complete and the painting of the walls has commenced. As a feature of the building, Alita engaged Cedar West to undertake the handcrafted cedar doors with a light oak stain to complement the church. The client is delighted with the end result.

Over the next few weeks Alita will complete the car park and the external paving. The church will be handed over to the client at the end of February.

Handcrafted cedar entry door from Cedar West

Inside construction of the St Peter's Church project by Alita Constructions

 

 

 

 

 

 

 

 

 

 

22/11/2017

Watch the recent progress  at our Church project in Wattle Grove.

 

03/10/2017

The roof has been installed by Jabez Roofing at our Church project in Wattle Grove. The first fix mechanical, electrical and hydraulic will continue over the coming days as well as the completion of the front facade. How good does that front facade look?

Church Construction Perth Church Construction Perth

 

 

 

15/09/2017 – The concrete tilt panels have been erected at our Church project in Wattle Grove. Structural steel installation is now underway and the roof cover will follow shortly after. We are looking forward to sharing photos of the curved windows and doors when they are installed!

Tilt_Panel_Church

The concrete tilt panels have been erected at our Church project in Wattle Grove.

 

Bassendean Workshop Development

Bassendean Workshop Development

Workshop Development in Bassendean

Alita Constructions has recently signed the contract for the construction of a workshop development in Bassendean. The 1,200m2 project consists of an office, workshop space and a mezzanine floor. Work will begin this month with the completion date expected in December 2017.

We look forward to sharing progress photos with you.

Architect: Mulder Kampman Designs

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Karri Wing Renovation, Amaroo Care Services

Amaroo Care Services refurbishment by Alita Constructions.

Alita Constructions has recently been awarded the refurbishment of an existing aged care facility for the Amaroo Care Services.

This project involves stripping all the shared bathrooms and turning them into individual en-suites for each room, widening all the bedrooms doors to allow wheelchair access, replacing all the floor coverings, cupboards and a general upgrade of the facility. We look forward to sharing progress photos with you.

Estimated completion date: 1st Of November.

Amaroo Village

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Kingdom Light Church

Rendered Image of Kingdom Light Church in Cockburn Central, Perth Construction by Alita Constructions

Kingdom Light Church

Alita Constructions has been awarded the construction of the Kingdom Light Church project located in Cockburn Central, Perth.

With a total floor area of 1,836m2, the project consists of 2 halls, large foyer and play area, classrooms and kitchen. The first floor also has several offices. This large place of worship requires 102 car bays.

We look forward to sharing updates with you.

Architect: Aquila Architects

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Construction Update:

19/12/2017

The Kingdom Light Church project located in Cockburn Central is off to a great start with the slab and panels poured and the lift scheduled for January 2018. We look forward to seeing this building take shape.   

John Calvin School Campus (Capel)

John Calvin School Campus by Alita Constructions

John Calvin School Campus project located in Capel

The Free Reformed School Association awarded Alita Constructions with the John Calvin School Campus project located in Capel earlier in 2017.   

This tilt panel School project included an administration block, library, extra curricular facilities/rooms, various classrooms and an undercover area.
Thanks to Mark (the Site Supervisor), the team at Alita Constructions, valued subcontractors and an amazing team at the Free Reformed School Association, this project was completed in 46 weeks.

Architect: Mulder Kampman Designs

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Construction Updates:

Capel John Calvin School Construction by Alita Constructions

 

20/06/2017: Watch the panel lift and the last couple of months progress at our Capel John Calvin School Project. All three buildings have full roof cover, while the plumbing and mechanical continue.

 

https://youtu.be/Be-5v8FxJf4

 

15/03/2017: Alita is excited that the first slab has been poured for the Capel John Calvin School Project. The next two slabs will be poured within the next few days and the manufacture of the concrete panels will follow shortly after.

20170313_Capel JCS Slab

 

Free Reformed Church of Baldivis

Baldivis Free Reformed Church built by Alita Constructions

● 802m2 of internal auditorium seating 328
● Foyer and meeting rooms
● Large verandah to cater for functions
● Large kitchen, with catering facilities
● Creche and large grass area for children
● Large carpark with 89 bays

 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Vincentian Retreat Centre

The-completed-Vincentian-Retreat-Karrakup-built-by-Alita-Constructions

Retreat Centre in Karrakup for the Vincentian Congregation Inc.

This single storey brick and timber truss roof building consists of a 600m² retreat centre with 22 rooms and adjoining ensuites and also a separate 83m² conference room.

 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

M & S Mechanical

Alita Constructions is to build 3 unit development includes a workshop and 2 warehouses.

Alita Constructions has begun work on another project located in the Forrestdale Business Park. The 3 unit development includes a workshop and 2 warehouses. Two units include upper storey offices and the other a mezzanine floor with a total floor area of 1525m2.

M&S Mechanical 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Caversham Community Centre

Completion photos of Caversham Community Centre - Signage - built by Alita Constructions

This tilt panel Community Centre project for the City of Swan, included a large function room, meeting room, club rooms, kiosk, sporting change rooms, multiple storerooms, a bin store and a play area. This was an exciting project for Alita Constructions’  to be involved in and we trust the new building will provide the City of Swan with the facilities to gather and engage the community for many years to come.

Thanks to Ed (the site supervisor), the team at Alita Constructions, valued subcontractors and an amazing team at the City of Swan and Donovan Payne Architects, this project was completed in 40 weeks.

 

Architect: Donovan Payne Architects

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

See more of our Community Centre Projects.

See our current projects.

Construction Update:

11/05/2017

We are very excited to announce that the Caversham Community Centre has reached practical completion. We look forward to sharing the completion photos with you shortly.

Caversham Community Centre signage by Alita Constructions

 

27/04/2017

With practical completion only weeks away for the Caversham Community Centre, here is a sneak peak of the project a few weeks back. We look forward to sharing the finished building with you.

 

Carpenter Mechanical

Carpenter_Mechanical_Front

Carpenter Mechanical Engineering 

The 1096.4m2 workshop for Carpenter Mechanical Engineering located in Canning Vale was uniquely designed to accommodate the client’s area of work, which is mainly servicing of mining machinery. The workshop features ;

– 1096.4m2 workshop with mezzanine

– two storey office with a total floor area of 262.1m2.

– Polished concrete throughout the lunchroom and corridors

– Washdown bay in the workshop

- And two roller doors

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Watch the Client Testimonial Video!

 

Watch the Carpenter Mechanical Completion video!

 

Watch the carpark pour time lapse. 

Groundbreaking Mining Solutions

Rendered image of the proposed workshop for GMS to be built by Alita Constructions

Groundbreaking Mining Solutions

Alita Constructions have begun work on another new project located in our very own Forrestdale Business Park. The building includes;

  • 1343.4m2 workshop
  • 378.3m2 warehouse
  • three storey office with a total floor area of 355.6m2.

The massive 2194.5m2 floor area build will provide ample space for GMS to conduct all their mining solutions.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 Construction UpdatePanels lifted at Groundbreaking Mining Solutions by Alita Constructions

19/01/2017

Watch the birds eye view of a panel being lifted at the GMS project located in Forrestdale.

50 panels were lifted in 2 days!

 

Free Reformed Church of Mundijong

Church built by Alita Constructions

Free Reformed Church of Mundijong

Running in conjunction with the building committee & tradespeople from the church, Alita Constructions completed the Mundijong Free Reformed Church. This Church is located in the beautiful rural setting of Mardella and comprises of a beautiful open plan church meeting hall that seats 377 people. The church has four meeting rooms and a large modern kitchen.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Watch the Free Reformed Church of Mundijong Completion video

 


Byford & Districts Country Club

highres-49

The Byford & Districts Country Club Project by Alita Constructions.

Alita Constructions is pleased to announce the completion of another quality project. The Byford & Districts Country Club. 

The Byford and Districts Country Club for the Serpentine Jarrahdale Shire was completed in a record 24 weeks, thanks to Ed, the site supervisor, the team at Alita Constructions, valued subcontractors and an amazing team at the Shire of Serpentine Jarrahdale.

This Community Centre Project includes a Bowling Green, Club Room, Bar, Dining and Function areas, various offices as well as a purpose built area for International Pool Competitions.

Externally there is an extensive verandah, paved areas and a future BBQ area. A 42m x 42m international standard covered bowling green has been installed as part of this project, including a curved single span roof with LED lights for use at night.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Video Testimonial from John Erren, President of the Serpentine Jarrahdale Shire 

Testimonial from the Serpentine Jarrahdale Shire. 

Watch our time lapse of the construction of the Byford & Districts Country Club. 

Watch the completion photo video of the Byford & Districts Country Club. 

24/02/2016

Watch the time lapse video of the concrete pours and panel lift. 

Beaver Tree Services

Commercial Construction of Beaver Tree Services built by Alita Constructions

This large multipurpose office/warehouse consists of 3 warehouses with a double storey office at the front. There is also an adjoining lunch bar, the first in the Forrestdale Business Park! In shed 3 there is a washdown bay and at the rear of the property there are 4 mulch bays and a petrol diesel bowser. A passenger lift has also been installed in the office to comply with the Disability Act of Access.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Watch the time lapse of the build. 

 Testimonial of Warehouse Construction by Paul Harrison, Managing Director of Beaver Tree Services

Alita Constructions would like to thank Paul Harrison from Beaver Tree Services for his glowing testimonial of the recently completed project in Forrestdale. The team at Alita Constructions thoroughly enjoyed working as a team with Paul and Joe and thank them for having the confidence in building with Alita.  Watch it here. 

 

Samoan Church, Baldivis

Twilight shot of the Samoan Church in Baldivis built by Alita Constructions

The Samoan Church appointed Alita Constructions with the construction of their place of worship, designed by Mulder Kampman Design.

The Samoan Independent Seventh Day Adventist Church is located in the beautiful rural setting of Baldivis and comprises of not only a large church with a 480 seat capacity auditorium with baptismal bath but also a multi-purpose hall and 7 bedroom residence. This large facility is set to be a focal point for the local Samoan community.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Watch the Construction Video.

Watch the completion photos video 

Construction Update

20/04/2016: Progress photos of the Samoan Church and The Manse – a house provided for the Minister of the Church.

The construction of the Samoan Church in Baldivis The Manse to the Samoan Church.

13/01/2016: Alita’s Concrete Team are currently finalising the last of 17 panels with the erection of the church proposed for the 27th of this month.  The roof carpenters are currently installing the wall framing on the residence and will have the roof trusses up by the end of the week. Work has begun and will continue on the Rainwater and Fire Tanks.

16/02/2016: The Alita Constructions in-house concrete team have been extremely busy during the last fortnight. The team lifted an impressive 77 panels in 2 and a half days at the Samoan Church Project. Great work team! Watch the time lapse video!

Joondalup Showrooms Development

Alita Constructions built quality Joondalup Showroom Development

Alita Constructions is pleased to announce the completion of another quality project – Joondalup Showrooms. 

This project is a 3 showroom development ranging in sizes from 1100m2 to 300m2 with a total floor area of 1960m2. The development provides ample parking for customers with a loading bay and employee parking at the rear of the building. 

This project was completed ahead of schedule  and on budget. Take a look at the completion photos on our videos page

 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

10/03/2016: Watch as Alita Constructions in-house concrete team pour 42 panels and lift them in a flash ready for the structural steel at the Joondalup Showroom Project. This project is now 40% complete. 

Testimonial

“Alita Constructions have just completed our 1960m2 commercial complex on time and within budget.

This is the fourth, large building (all over 1500m2) we have had constructed.  The previous three, by three different builders and this was the first building to be built without a hitch.

Alita Constructions built the building to the standard originally promised.  In fact during construction they suggested improvements to the design always with cost in mind.  The building was built within the schedule and the quality was such that our leasing agents congratulated the builder on the quality which made it very easy to find tenants on our behalf.

Constant communication occurred between us and Alita Constructions.  The staff were very approachable, polite and friendly and obliging whenever possible.

Thank you Alita.  We have no hesitation in recommending your company to anyone wishing to

delve into the world of commercial building construction.”

Dan Heeris and Beth Baron

Alita Constructions

Alita Constructions, 38 Hensbrook Loop, Forrestdale

As Alita Constructions specialises in tilt-up panel construction for large-scale buildings, they saw the need for a larger premises as an opportunity to use their personal building as a display for the quality projects that they produce.

The building consisted of 44  tilt panels which have been fitted with Alucobond panels creating an aesthetically appealing building.

The reception, pre-start room and lunchroom floors have been finished with polished concrete whilst, the large open plan area upstairs was designed to allow for future growth. The warehouse was designed specifically for the use of high racking to store equipment and stock. Three roller doors (two on one side and one on the other) in the warehouse allow easy access for the trucks and trailers to come in and out.

The Alita Constructions Panel signage at the front of the property is also covered in Alucobond providing a unique use of tilt panel.

This Project was completed in approximately 12 months.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

The Rocks Church

Church development by Alita Constructions

The Rocks Church, Cannington

This large 1400m2 church has a large auditorium that can seat 500 people, a 3220L baptismal bath, 3 proposed offices, large seminar room, large timber stage and a parents room. 

The Rocks Church appointed Alita Constructions with the construction of their phase 1 project, designed by T&Z Architects.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

 Testimonial from The Rocks Church

Alita Constructions would like to thank Simon from The Rocks Church for his glowing testimonial of the recently completed place of Worship in Cannington. The team at Alita Constructions thoroughly enjoyed working as a team with the Church and thank them for having the confidence in building with Alita.

 Watch the video testimonial 

APT

The recently completed APT by Alita Constructions

Alita Constructions is pleased to announce the completion of another quality project.

This building for Advanced Polymer Technologies consists of a two storey office on the front of a well equipped workshop, including an 10t overhead crane, an enclosed space specifically designed for sandblasting and a rear covered area for additional storage space. This project was completed in 9 months.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Watch the construction time lapse or the completed project video.

This type of facility is ideally suited to our Design & Construct capability which carries through from initial client discussion, design, council approvals, documentation and construction all as a “one stop shop”.

Testimonial

“Advanced Polymer Technology had the pleasure of working with Alita Constructions on the build of our state of the art polyurethane manufacturing facility. As this is the first time Advanced Polymer Technology had built a commercial facility, the process was quite daunting to us until Alita Constructions came on board. We had ideas of what we wanted to build but were unsure of how it all would tie together, with the help of Alastair and his team of professionals we were able to figure out a design that best suited our needs and budget.

Once the design process was complete, Alita Constructions began building our facility which was a highly professional and easy process. Any queries we had were answered almost immediately & any issues were solved quickly. We were kept in the loop at all times and were told when major installs were happening so we could view them, which was fantastic and made us feel like we were a part of the team. Our build was completed within the specified time frame and budget. The handover process was quick and thorough and any post occupancy items are attended to quickly. 

I would like to thank Alastair and his team for making the build such an easy and enjoyable process. With the high level of client service we received and the high quality of the build, we recommend them to all those looking at building.”

 Ryan Dowling

Read more of our testimonials

 

 

Armadale Steel Forrestdale

Armadale Steel Warehouse "A" framed tilt panel frontage by Alita Constructions

Forrestdale Warehouse Construction – Armadale Steel

This Forrestdale warehouse construction includes a 5620m2 warehouse with a front office and a mezzanine floor which was designed specifically with the occupants needs in mind. It features an undercover loading bay area with a 5T overhead crane. A large driveway has been poured around the building to allow for easy access to the 11 roller doors by delivery trucks and forklifts.


The office floor has a nice polished concrete finish and the large amounts of glazing on the front of the building gives the office plenty of natural light into the office.

 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Seasons Funeral Parlour

Seasons Funeral Parlour

In 2008 Alita Constructions completed this specialised build for Seasons Funeral Parlour. Much thought and effort was put into the design of the building to ensure it functions well and also sensitively accommodates the needs of the deceased’s family and friends. The building features an undercover drop off and pick up area, a waiting room, a chapel, viewing rooms, meeting rooms, kitchens and a large triple garage for the hearse which is accessible from inside the building.

 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Byford Sports Hall

Byford Sports Hall

The Free Reformed School Association received funding as part of the Building the Education Revolution Program. This funding was used to build multi-purpose sport halls at three of its schools in Byford, Kelmscott and Rockingham. Alita Constructions was awarded the contract for all three, which were built over a period of 12 months. The three halls comprising toilet facilities, kitchens and storage rooms were built using a combination of precast concrete tilt panels, structural steel wall and roof framing, and were lined internally with insulated wall panels. All three halls are serviced by Fujiclean waste water recycling systems and the recycled water is used to irrigate the surrounding gardens.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Free Reformed Church of Darling Downs

Darling Downs Church04

This unique project involved building the first stage of a church building which is licensed to seat 350 people. The first stage of the build included a large meeting hall, kitchen, crèche facilities and a number of smaller meeting rooms. Future plans hope to see a large naïve added to the building. Throughout the design and construction of this project we worked closely with the building committee from the Free Reformed Church of Darling Downs. A combination of acrylic rendered precast concrete panels, feature brick walls and exposed structural columns give this church a modern look while still complimenting its rural setting.

This Project was completed in approximately 50 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Ritalyda

Factory built by Alita Constructions

Comprising four units split over two levels, this project on Browning Rd, Armadale was built for a company that operates both as a cabinet maker and a manufacturer of stone bench tops. The process of cutting and polishing the stone uses substantial amounts of water, so a complex system of sloping floors, floor drains and a state of the art water filtration system was designed and built so that 90% of the water used is recycled water. Four gantry cranes aid in the movement of the stone between the various CNC machines. To gain the required water flow and pressure for the fire protection system, diesel powered pumps draw water from two storage tanks. The development is connected to two Fujiclean waste water recycling systems and the recycled waste is used to irrigate the surrounding gardens.

This Project was completed in approximately 34 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

 

 

Byford Medical Centre

Byford Medical Centre built by Alita Constructions

The Byford Medical Centre Construction by Alita Constructions

The construction of the Byford Medical Centre includes medical consultation rooms, pathology, podiatry, psychology, physiotherapy and a pharmacy.

The Byford Medical Centre is set in the ever increasing Serpentine Jarrahdale Shire.

This project was on a tight timeframe, yet, despite the challenges was still built on time and within budget.

“For me probably the most important was to get a quality product at a reasonable price and I think Alita well and truly delivered on that product and I’m very delighted with the outcome. The words I probably use to describe Alita Constructions; they were very open, trustworthy, my calls were always returned and replied and problems were solved fairly quickly and fairly succinctly. Yeah I would recommend Alita on quality of product, very fair price and a good reliable and efficient team and the construction project went very, very well. “

Watch the video testimonial here

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Croker Construction 

Croker Construction in Forrestdale built by Alita Constructions

Croker Construction

This Project for Croker Construction, in Forrestdale,  included a 100m2 washdown bay with 300m2 office (including mezzanine) and 850m2 of concrete carpark. The building has been designed for a civil construction company that required a 10 tonne crane to service their machinery. The project finished on time, whilst still allowing the client to complete their office fit out prior to handover.

This Project was completed in approximately 29 weeks (a month and a half early).

 

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

TESTIMONIAL

Alita Constructionas have just finished our new office & workshop Forrestdale and we couldn’t be happier.

We picked Alita from the three quotes based on price and experience.

All the planning consultations were pleasant experiences and they have friendly team.

Throughout the build they were always easy to get hold of and approachable.

We will recommend Alita to anyone. You only have to drive around our business park & see that they are building 50% or more of the buildings. That speaks volumes to me.

Nathan Croker

General Manager

See more of our Testimonials here

Agrifil

Massive Agrifil Factory in Hope Valley constructed by Alita Constructions

Massive Factory Construction in Hope Valley, Perth – Agrifil 

The exciting Agrifil Project included a 7590m2 factory with a 260m2 office and 5200m2 of concrete carpark. The building was designed for a fertiliser manufacturer so the concrete was designed with special chemicals to ensure the chemicals of the fertilisers did not damage the concrete over time. The factory was 60m wide and the trusses were a single span, meaning no columns in the middle of the factory. It was one of the biggest truss spans in WA. No columns in the middle of the factory was required due to the use of large trucks and forklifts in the warehouse.

The project included the install and commission of two water tanks each holding ninety six thousand litres of water. The tanks are connected to the roof and they supply the whole building with water including the garden reticulation system.

Once the tanks get low on water, the system switches over to mains water. This design ensures waste water is minimised and the building is water efficient by utilising the rain water.       

The client was able to operate in part of the building while the rest of the building was being completed due to Alita Constructions managing to make part of the building safe to use and organising all the paperwork with the consultants and council in order to get a partial Occupancy Permit.

This Project was completed in approximately 12 months.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

 

Testimonial

Alita constructions were selected to build our facility from a short list of four construction companies 2 years ago. They were easily selected because of their very professional approach to every detail of the very difficult and challenging design and layout of our project. Their “can do” culture within Alita came through very early in our discussions which also included level headed costings and understanding budgetary constraints. The project was undertaken and completed within expected time frames and which also allowed for partial occupation while they very professionally worked around our day to day operations without any issues. This was very much appreciated and marveled. In the eighteen months it took to build this difficult facility it was an absolute pleasure to have been able to talk with any personnel from Alita and discuss queries if and when they manifested. From accounts through to the managing director everybody was accessible and were more than happy to apportion time to talk. Project management was impeccable. Alita built us a beautiful and functional building which we are very proud of and which is much talked about and marveled within the business community. I recommend Alita very highly to any prospective client of theirs who may be considering a building project. I will use Alita again for any projects I may have going forward.

Mike Johnson, Agrifil Director.

 

Carey Baptist College

carey-baptist-college

The Carey Baptist Community Centre Stage 10 project was a double storey complete fit-out building which joined onto an existing Sports Centre at the Carey Baptist College in Harrisdale. It was finished on the 10th March 2015 and the internal fit-out included a childcare centre, cafe, uniform shop, kitchens and offices. The architect, T&Z Architects was the superintendent for the job so Alita worked in closely with them.

The job site was run on a fully functional school ground meaning the logistics of school children, cranes, truck deliveries and parent drop-offs/pickups all had to be managed thoroughly to ensure the safety of all persons at all times. There was a great amount of liaising with the school and flexibility by Alita to ensure the school could function as normal as much as possible during the construction period. Alita managed a 100% safety record with no injuries or potential dangers reported by any children, parents or teachers. All workers also had to have a police clearance or sign a confidential declaration to ensure the safety of all children at all times.

Overall this Carey Baptist Community Centre was a great success and a good achievement by all involved. Alita managed to complete the project two and a half weeks early, much to the delight of the school.

This Project was completed in approximately 12 months.

Architect: T & Z Architects

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Character Cabinets

Character Cabinets

Character Cabinets

This factory unit construction was for Character Cabinets. It features a double story office and a large warehouse. The building is mainly constructed using concrete tilt panels which are all approximately eight metres in height. The office area contains seven offices as well as a lunch room and some meeting rooms. There is truck access to the side of the warehouse for all deliveries and pickups as well as forklift access into the warehouse. Character Cabinets also features a black concrete car park and black garrison fencing with automatic gates for security.

This project was completed in 22 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Testimonial

I have had the pleasure of working with Alistair and the team at Alita Constructions for more than 10 years now and over that time they have proven to be very efficient company that conducts themselves with the utmost professionalism. I enlisted the help from Alita Constructions to build my last 4 projects, the latest being a new 4 unit factory complex in Armadale. This was no simple build for Ed (building supervisor) as water tanks, filters and extensive drainage systems were required for recycling to one of the units. Many changes were made during the building process to make this possible and at no stage was I left to feel that my changes were too much trouble, all variations were made with ease and were cost effective. The Staff at Alita always communicated well with me during the building process with regular updates even whilst being overseas making the entire build relatively easy. Alita’s work has always been of the highest quality and I would have no hesitation in recommending Alita Constructions to any potential client wishing to build a quality new Home or Factory.

Squeak Van Duyn

See more testimonials here

O’Neil Real Estate

Pictures-matt-023

This project was for a Real Estate Agency and therefore consisted of mainly offices. The external walls were concrete tilt-panel with gyprock partitions internally. The building features air-conditioning throughout, stonework, kitchens and a large bitumen carpark.

This Project was completed in approximately 38 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Acutech Piping Systems

Acutech

This Project involved the construction of a double story office on the front of the building with an adjoining warehouse for the manufacturing of pipe. The building includes thirty-four panels most of which are approximately nine metres high. There is truck access to both the side and the rear of the building for delivery pickups and drop offs. The office features a tiled 15m² balcony as well as fifteen offices and many other specialized rooms

This Project was completed in 26 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Serpentine Jarrahdale Community Resource Centre

LMD03-p-02

The Serpentine Jarrahdale Community Resource Centre was a project with a tight budget and a tight schedule. It was completed within the six months given and was within the tight budget.

The construction included three panels. The front panel was made of brown concrete and later polished to show coloured stones. Face brickwork and stud walls completed the rest of the building. The building features a veranda three quarters of the way around as well raised and curved ceilings.

This Project was completed in approximately 24 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

CPS Wearparts

Warehouse construction

CPS Wearparts Warehouse

This warehouse construction involved a large warehouse with a two storey office and ammenities. Being a corner block, the building was designed to have an entrance from two different streets. This allows delivery trucks to drive through and if a delivery truck is blocking one entrance, cars can still access the carpark.

The building features double glazed windows throughout to achieve a high energy star rating. It also features air-conditioning throughout, a big kitchen and lunchroom, a store managers office which views the factory and three rollerdoors.

This Project was completed in approximately 34 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

CPS Wearparts is now Fortus

See our other warehouse construction projects.

A & A Kitchens

A&A Kitchens Forrestdale

A & A Kitchens

This project for A&A Cabinets involved the construction of a concrete tilt panel warehouse with a double storey office complete with kitchens, lunch rooms, offices and a balcony. The full height glazing in the upstairs office area together with the orange feature cladding and the balcony ensure the building looks aesthetically pleasing and at the same time functional. Anti-graffiti paint has also been applied to the front of the building.

Due to the fact it was built for a cabinet maker, the appropriate design steps were taken to ensure the power requested was enough to service their machines. Also the roller doors on both sides ensure easy access for deliveries and pick-ups. The design also took into account the fact that air-pipes needed to go throughout the building as well as power for the work stations.

This job was completed in 34 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Testimonial

We recommend Alita Constructions as a quality, efficient and helpful commercial builder……

Read the Client Testimonial 

Tyremax

alita_Baille_Road_6

This large project featured a warehouse of 5270m2 and a double storey office area with full height glazing. Due to council requirements this building had to be fitted with an automatic fire sprinkler system throughout the whole building with some of the sprinklers fitted inside the racking. This fire system included 3 tanks of water each containing 247KL, a sprinkler booster and 3 diesel pumps. The building also features a fire tunnel for quick and safe emergency exit in case of a fire.

The Alucobond together with the texture and louvers gives the building a fantastic finish which compliments the office fit-out. The office fitout consists of full height glass partitioned offices as well as a kitchen, a stainless steel lift and toilets which are all fitted out with top quality fixtures.

The office and warehouse is fitted with an Electronic Access Control System so that the owners can control who gets access to what and also monitor this access. The complete property is under 24hr surveillance.

This Project was completed in approximately 43 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Westpoint Engineering – Zedora Turn

DSC_0015

This Project involved the construction of a warehouse with adjoined office and reception area. Above the office area a mezzanine floor which is for storage. The building was constructed close to the two metre boundary retaining wall so the building was Engineered with piles etc to achieve this and therefore maximise the use of the land area. At the front of the building there is one large 10m roller shutter which is great for access by large equipement into the factory. The factory has a five tonne crane covering the complete floor area.

This Project was completed in approximately 36 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

Fair Haven Retirement Village

alita-photos-71

This Project was an extension for a retirement village. The Project included demolishing a wall and joining on seven extra bedrooms each with their own ensuite. The extension includes a kitchen and a common sitting room as well as a gazebo and verandas. The main entrance was also rebuilt to allow for an undercover pickup and drop-off area as shown in the pictures above.

This Project was completed in 24 weeks.