Carpenter Mechanical by Alita Constructions

Alita Constructions have begun work on another new project located in Canning Vale. The proposed workshop has uniquely been designed to accommodate their area of work, which is mainly servicing of mining machinery. The workshop features ;
– 1096.4m2 workshop with mezzanine
– two storey office with a total floor area of 262.1m2.
– Polished concrete throughout the lunchroom and corridors
– Washdown bay in the workshop
– And two roller doors