Westpoint Engineering – Zedora Turn

Westpoint Engineering – Zedora Turn

Address: Lot 48 Zedora Turn, Henderson

Completion Date: 01/04/2011

Floor Area: 627m²

This Project involved the construction of a warehouse with adjoined office and reception area. Above the office area a mezzanine floor which is for storage. The building was constructed close to the two metre boundary retaining wall so the building was Engineered with piles etc to achieve this and therefore maximise the use of the land area. At the front of the building there is one large 10m roller shutter which is great for access by large equipement into the factory. The factory has a five tonne crane covering the complete floor area.

This Project was completed in approximately 36 weeks.

We’re passionate about helping you make your building requirements a reality. Contact us if you’d like to chat about your project or arrange a meeting.

View More Projects

Reach Out Today

  • This field is for validation purposes and should be left unchanged.