This Project involved the construction of a warehouse with adjoined office and reception area. Above the office area a mezzanine floor which is for storage. The building was constructed close to the two metre boundary retaining wall so the building was Engineered with piles etc to achieve this and therefore maximise the use of the land area. At the front of the building there is one large 10m roller shutter which is great for access by large equipement into the factory. The factory has a five tonne crane covering the complete floor area.
This Project was completed in approximately 36 weeks.